Site selection: own, catalogue, selection. Expertise (designation, encumbrance, technical compliance. Conclusion of an agency contract for site search.
Choosing the right house model.
Conclusion of a contract for design work and a contract for the construction of the house, tying the house to the plot.
Conclusion of a contract for the supply of a house kit in accordance with the specification.
Submission of the architectural design to the administration. Obtaining a building permit. Licence.
Site clearance and surveying
Foundation design.
Three options: concrete bollards, slab, basement.
Frame assembly. Delivery of frame parts from the hoard to the site and assembly.
Intermediate Floors on the 1st floor
Rough flooring.
Interior perimeter walls
Ceiling, roofing
Utilities. (light/water/air conditioning/ventilation)
Windows and doors
Pre-installation of equipment and communications
Air conditioning, ventilation, Smart home.
Finishing (interior panels)
Skirting board installation
Bathroom. Tiled finish, installation of sanitary installations.
Stretch ceiling. Installation of light fittings.
Underfloor heating installation.
Installing quartz vinyl laminate
Equipment installation and start-up
Handover of the property, registration of ownership documents
.
GET YOUR NEW HOME BY MAIL.
Leave us your contacts and we send you detailed information about our products. We are open for cooperation.